Basement Waterproofing — Commercial Tower

Basement Waterproofing — Commercial Tower

Crystalline and membrane waterproofing of a three-level basement subject to a high water table, delivered leak-free on a tight schedule.

The challenge

A three-level basement under a high water table was showing seepage at construction joints and the raft slab during the monsoon, threatening parking and plant areas.

Our solution

  • Crystalline coating applied to the raft and retaining walls for integral protection
  • PU injection to seal active leaks at construction joints
  • Liquid-applied membrane at podium and planter zones
  • Full flood testing before handover

The result

The basement passed flood testing with zero leakage and has remained dry through a full monsoon season.